From site evidence to a draft you can review
Record a 2-3 minute site walkthrough. NexBilt carefully analyses the video, photos and notes, then drafts the scope for you.

AI scoping and quoting tool for builders and trades.
Quote from local pricebooks or your own rates.
Bring one real job. Quote it in NexBilt.
If it doesn't beat your current process, delete the account.
That's the whole pitch.
PROPERTY • ASSESSMENT • CONSTRUCTION
Create property reports, assessments, scopes, quotes and project plans from the same site evidence.
How it works
Record a 2-3 minute site walkthrough. NexBilt carefully analyses the video, photos and notes, then drafts the scope for you.

Every line item is priced from up to date regional pricebooks or from your custom rates.

A trade-based Gantt with real dependency logic. Adjust one trade and dependent trades cleanly re-flow. NexBilt then notifies the affected trades and client of changes. No rebuilding schedules at 10pm.

Quote, scope, SWMS and schedule bundled into one program.

The stack
Each module talks to the others. A scope edit reshapes the quote. A quote build seeds the schedule. The schedule generates the SWMS pack.
Same job, different day
Before
With NexBilt
Pricing
Every plan includes a monthly credit balance. Top up any time.
billed yearly · save 15%
For the sole trader and small crew running quotes weekly.
billed yearly · save 15%
For growing trades with a team on the tools.
billed yearly · save 15%
The full builder workflow — quoting, PM, variations.
billed yearly · save 15%
For firms running 10+ live jobs at once.
Request a demo
Book a 20-minute call. Bring a real quote, plan set, or site photos — we'll show you exactly how NexBilt would handle it, priced from your own rates.

A good prompt is only the start.
Why AI quoting tools need more than a prompt and a rate. How NexBilt turns site information into a scoped, priced quote.
Read the guide
See the whole job before it hits the quote.
Why most quotes leak margin before the job starts — and how to write a scope-first quote that protects your profit.
Read the guideNexBilt turns site evidence into client-ready quotes, scopes and reports - built for Australian builders and tradies. Less admin. More action.
© 2026 NexBilt. All rights reserved.
All software code, workflows, prompts, AI logic, templates, user interface designs, trade-first scope formatting, pricing logic, and documentation contained in this application are the exclusive intellectual property of NexBilt and may not be copied, reproduced, modified, or redistributed without written permission.